Rangka

Free construction field utility

Punch List and Snag List Template

Build a structural, piping, or mechanical close-out register during the walkdown, assign each item, and print the reviewed list.

No signup requiredUse in your browserReview before field use

How to use it

  1. Record an exact location, system, and factual defect description.
  2. Assign an owner and due date under the project procedure.
  3. Verify rectification and evidence before changing the item status.

Field-use boundary

The register supports a walkdown; it does not replace the approved ITP, test pack, completion certificate, or client acceptance process. Keep photographs and inspection records with the controlled item.

Keep the record

Keep the input, responsible-person review, project document revision, and issued output together in the controlled project file.

Related working references

Need the field evidence and PM review in one project record?

Create a free workspace and connect the first project when you are ready to bring the workflow together.

Sign in